Views: 4 Author: Site Editor Publish Time: 2022-09-26 Origin: Site
1. Safe use
Safe use must be an integral part of the risk assessment system.
All employees have to stop any tasks and operations.
A safety improvement suggestion system must be established for employees.
2. Guardrails and signs
Signs must be prevented at all access points in the facility.
Permanently install guardrails and interlocks.
Guardrails should be reviewed for damage and repair.
3. Isolation and Shutdown
Quarantine documents must indicate the name of the person authorized to complete the quarantine, the type of quarantine, the location and any measures taken.
The isolation lock must be equipped with only one key - no other duplicate keys and master keys may be provided.
The isolation lock must be clearly marked with the name and contact information of the management personnel.
4. Duties and Responsibilities
Management should define, enforce and review quarantine policies.
Authorized supervisors should develop and verify specific procedures.
Plant managers should ensure that safety policies and procedures are implemented.
5. Training and Qualifications
Authorised supervisors must be trained and their qualifications verified.
All training must be clear and all personnel must understand the consequences of non-compliance.
Systematic and up-to-date training content should be provided to all personnel
Square cold-formed hollow section steel is a section steel with square cross-section shape and size made of hot-rolled steel plate after cold-bending and then high-frequency welding. It is also called welded square steel pipe. The section steel has a stable production process and high precision, and
The straight seam welded pipe unit sends the strip steel into the welded pipe unit, and after rolling by multiple rollers, the strip steel is gradually rolled up to form a round tube billet with an opening gap. Adjust the reduction of the extrusion roller to control the weld seam gap at 1~3mm, and m
First of all: in the process of use, we must strictly operate in accordance with the operating procedures in the instruction manual, let alone overload the machine and use it, and before complaining about the production, that is, the operation of the machine, we must check all aspects of the machine